Freephone: 0800 0 319 200

Telephone: 0161 941 5571

Email: sales@ctm.co.uk

Victor & Percy

Photo Gallery 2008:
Electric: Periodic inspection and testing

Click here to return to main gallery
Click here to return to Electric gallery

Click on images below to enlarge

Initial verification supply equipment Initial verification

Initial verification 1

Initial verification 2

Initial verification meter Inspection 10mm Main bond to gas

Initial verification 3

Inspection 10mm Main bond to gas 1

Inspection 10mm Main bond to gas Inspection 10mm Main bond to water

Inspection 10mm Main bond to gas 2

Inspection 10mm Main bond to water

16mm Meter tails Checking supplementary bonding under bathroom floor

Inspection 16mm Meter tails

Inspection Checking supplementary bonding under bathroom floor

Checking the condition of conductors behind accessory Checking the condition of conductors behind accessory

Inspection Checking the condition of conductors behind accessory 1

Inspection Checking the condition of conductors behind accessory 2

Checking the condition of conductors Checking the conductors under the fuse carriers

Inspection Checking the condition of conductors

Inspection Checking the conductors under the fuse carriers

Checking the size of the suppliers fuse for earthing arrangements Consumer unit outdoors watertight so not a fault

Inspection Checking the size of the suppliers fuse for earthing arrangements

Inspection Consumer unit outdoors watertight so not a fault 1

Consumer unit outdoors watertight so not a fault Inspection exposing the conductors

Inspection Consumer unit outdoors watertight so not a fault 2

Inspection exposing the conductors 1

Inspection exposing the conductors Incoming supply and suppliers 100A fuse

Inspection exposing the conductors 2

Inspection Incoming supply and suppliers 100A fuse

Inspection Investigating behind accessories Inspection Investigating behind accessories

Inspection Investigating behind accessories 1

Inspection Investigating behind accessories 2

Looking for flora or fauna that might cause damage Noting the quality of the installation

Inspection Looking for flora or fauna that might cause damage

Inspection Noting the quality of the installation

Inspection Noting ware and damage to installation

Inspection Preparing conductors for testing

Preparing to test after main supply isolated due to exposed conductors The consumer unit

Inspection Preparing to test after main supply isolated due to exposed conductors

Inspection The consumer unit

The earthing arrangements Checking for loop impedance on final ring Zs

Inspection The earthing arrangements

Testing Checking for loop impedance on final ring Zs

Checking for loop impedance Zs Conducting a Ze test

Testing Checking for loop impedance Zs

Testing Conducting a Ze test

First stage of final ring test taking end to end readings of r1 First stage of final ring test taking end to end readings of rn

Testing First stage of final ring test taking end to end readings of r1

Testing First stage of final ring test taking end to end readings of rn

Last stage of final ring test taking R1 + R2 readings 1 Preparing to take a R1 + R2 reading

Testing Last stage of final ring test taking R1 + R2 readings 1

Testing Preparing to take a R1 + R2 reading

Taking a reading from a lighting circuit Taking a Zs reading using an adaptor 1

Testing Taking a reading from a lighting circuit

Testing Taking a Zs reading using an adaptor 1

Taking a Zs reading using an adaptor 2 Taking a Zs reading using an adaptor 3

Testing Taking a Zs reading using an adaptor 2

Testing Taking a Zs reading using an adaptor 3

Taking an R1 + R2 reading notice earth bar connection Fault 60 year old accessory still live

Testing Taking an R1 + R2 reading notice earth bar connection

Fault 60 year old accessory still live

Fault 60 year old cable still live Fault Cable not supported

Fault 60 year old cable still live

Fault Cable not supported

Fault Exposed conductive part 1 ault Exposed conductive part 2

Fault Exposed conductive part 1

Fault Exposed conductive part 2

Fault Exposed conductive part 3 Fault Exposed conductive part

Fault Exposed conductive part 3

Fault Exposed conductive part

Fault Exposed conductive parts Fault Fitting not correctly supported 1

Fault Exposed conductive parts

Fault Fitting not correctly supported 1

Fault Fitting not correctly supported 2 Fault Fitting not correctly supported 3

Fault Fitting not correctly supported 2

Fault Fitting not correctly supported 3

Fault Fitting not suitable for zone Fault Fitting Not suitable for zone 2

Fault Fitting not suitable for zone

Fault Fitting Not suitable for zone 2

Fault Incorrect termination of live part 1 Fault Incorrect termination of live part 2

Fault Incorrect termination of live part 1

Fault Incorrect termination of live part 2

Fault limited access to accessory Fault Line conductor incorrectly marked as CPC

Fault limited access to accessory

Fault Line conductor incorrectly marked as CPC

Fault Overloaded sockets 1 Fault Overloaded sockets 2

Fault Overloaded sockets 1

Fault Overloaded sockets 2

Fault Overloaded sockets 3 Fault Overloaded sockets 4

Fault Overloaded sockets 3

Fault Overloaded sockets 4

Fault Overloaded sockets 5 Fault Potential damage to live conductor

Fault Overloaded sockets 5

Fault Potential damage to live conductor taped to heating flow pipe and main bonding conductor

Fault Signs of overheating Fault Signs of overheating 3

Fault Signs of overheating

Fault Signs of overheating 3

Fault Smoke detector removed and not linked Report A four page document to be completed at the office

Fault Smoke detector removed and not linked

Report A four page document to be completed at the office

Report Recording observations and test results  

Report Recording observations and test results